•	Feasibility and Demographic Studies
•	Consultation and Design Services
•	Equipment Layouts – Hand Drawings, 2D or 3D animated CAD
•	Dimensioned Load Bearing Electrical Rough-In Drawings
•	Dimensioned Load Bearing Plumbing Rough-In Drawings
•	Dimensioned Special Condition Drawings
•	Ventilation Drawings
•	Specification Books – (contain manufacturer’s cut sheets & written specifications)
•	Elevations and Detail Drawings of All Custom Equipment
•	Seating Layout
•	Furniture Specifications – (samples are available in exact fabric & finishes)
•	Bid Evaluations
•	Health Department Approval Tracking
•	Review of Submittals
•	On Site Inspections
•	Final Inspection Punch List
 •	Preliminary design criterion meeting with the Owner, Architect, and any other members of the design team to establish the goals and objectives of the project.
•	Create As-Build Drawings for Development of Existing Facility
•	Inventory existing equipment to be integrated into the new kitchen layout
•	Develop a preliminary layout (normally within 15 business days)
•	Provide preliminary design review meeting to insure the layout meets the client’s concept ideas.
•	Final review and signoff of the preliminary layout & equipment specifications.
•	Completion of the final floor plan, electrical & plumbing rough-in drawings, special condition & ventilation drawings
•	Finalize the specification book to include for each piece of equipment listed:
 a manufacturer’s cut sheet or custom equipment elevation, and a cover sheet containing the item number, description, quantity, manufacturer (primary & approved alternates), model number, critical mechanical information, and a listing of approved accessories.
•	Bidding of the project to a minimum of 3 qualified pre-screened equipment dealerships.
•	Provide the client with an itemized spreadsheet of the final bids
•	Review of Submittals
•	Health Department Approval Tracking
•	On Site Inspections & Punch List

